Cooler-Climate Site Assessment

From ₩2,800,000 per site visit 1–2 days on site + 5 business days for report South Korea — Gangwon, Jeolla, Gyeongsang provinces
Cooler-Climate Site Assessment

Who this is for

Operators planning to commission air-cooled or hybrid-cooled mining equipment at 0.05 PH/s or above in locations where winter morning intake air regularly falls below 5 °C. Suitable for warehouse conversions, container rows, and repurposed agricultural buildings.

What you receive

A signed assessment report (typically 18–30 pages) containing:

  • Measured intake and exhaust temperature profiles across a 24-hour window
  • Rack density recommendation relative to your ceiling height and duct layout
  • PSU derating notes for your local voltage band and expected low-temperature starts
  • Condensate and frost-risk observations at hashboard inlet paths
  • Pass/fail verdict on holding declared hashrate at the 0.05 PH/s floor during the coldest recorded hour
  • Photographic appendix of intake louvers, filter banks, and cable tray clearances

Scope included

  • One site visit by two engineers (thermal lead + electrical observer)
  • Up to 40 miner positions or equivalent container modules surveyed
  • Pool-side hashrate cross-check if internet connectivity is available on site
  • One revision round for factual corrections within 14 days of delivery

Scope excluded

  • Structural engineering sign-off on floor load or roof span
  • Electrical permit filing with local authorities
  • Ongoing monitoring after handover
  • Equipment purchase or installation labour

Process

  1. Intake call — You share rig model, target hashrate, site address, and commissioning timeline.
  2. Scheduling — We book a visit during your preferred season window (winter assessments require ambient below 10 °C).
  3. Site day — Engineers document intake paths, run thermal cameras along rack faces, and log PSU inlet temps.
  4. Report delivery — PDF arrives within five business days. A 30-minute phone walkthrough is included.

Preparation required from you

Provide site access, a single-line electrical diagram if available, and firmware version numbers for units already installed. Clear snow or debris from exterior intake louvers before our arrival.

Pricing basis

From ₩2,800,000 per site visit. Final quote depends on travel distance from Daegu, number of container modules, and whether overnight monitoring is requested. Remote highland sites in Gangwon may incur lodging costs quoted upfront.

Next step

Submit an inquiry through our contact page with your proposed location and rig specifications. We respond within two business days with a firm quote and available dates.

Request this service